Takeoff From Plans: Checklist
The order to work through a set of drawings so you do not miss a page and price two thirds of a job. Method, not formulas.
Low risk
General use, safe to send as-is once you've filled the gaps.
Open this template
Copy to clipboard, or download as Word or PDF.
Format: Document (Word / PDF) · Downloaded 0 times
When to use this
- •Pricing from a drawing set
- •First time estimating
- •A job came in short on materials
Read first
How to do a material takeoff from a set of plans →Background guide explaining when and how to use this template.