Painting has one of the lowest entry costs in the trades, which makes it easy to start and crowded to compete in, so the pricing problem is not what to charge, it is how not to be dragged to the bottom by people who have not priced prep, protection or the federal lead rule. Prep is most of the labor and none of the visible result. The EPA Lead-Safe rule is the one real barrier in the trade, and on pre-1978 work it is a cost your uncertified competitor is not carrying. Here is the number.
Start with the stack
Labor, payroll burden, materials, a share of overhead, then profit as its own line: How to price your work so you actually make money and What Should I Actually Charge?. Below is the painting part.
Prep is the job, and the customer thinks they are buying paint
Almost all of the labor in a good paint job happens before any finish coat goes on: washing, scraping, sanding, filling, caulking, repairing, priming, masking, and protecting everything that is not being painted. The finish coats are the fast part.
That creates the trade's structural pricing problem. A customer comparing two quotes sees the same rooms and the same color, and the difference between the numbers is prep they cannot see and will not be told about by the cheaper bidder. So the prep has to be visible in your document. List it as a specification: what will be washed, what will be scraped and sanded, what will be filled and caulked, what is being primed and with what, how many coats, and what will be protected.
That list is the whole argument for your price, and it is why How to explain your price when they say "that's a lot" is the companion to this page. It is also why the exclusions matter: What Is NOT Included: Exclusions List.
The condition of the surface is the variable that ruins fixed prices
Repaint work is where painters lose money, and it is nearly always the substrate.
- Failing or unknown existing coatings. Peeling, chalking, or an incompatible previous product means stripping and full prep rather than a scuff and a coat.
- Wood in poor condition. Rot, failed glazing, and open joints are carpentry inside a painting quote.
- Substrate repairs generally. Filler and caulk are cheap; the hours are not.
- Color changes. Going light over dark, or covering a strong color, is an extra coat that nobody quoted.
- Water damage or mold, which is a different scope entirely and should be excluded until dealt with.
Every one of those belongs in the quote as an assumption and an exclusion: the price assumes existing coatings are sound and adherent, and repair of failing substrate or coatings is priced separately.
What else drives the price
- Height and access. Ladders, staging and lifts change the labor per square foot and change the risk. On exterior work at height, When do I need fall protection, and what counts? and Ladder safety on site.
- Cut-in versus roll. Trim, sashes, spindles, railings and detailed millwork take far longer per square foot than an open wall. Two rooms of identical area are not the same job.
- Spray, brush or roll, which changes the masking as much as the application.
- Occupied or empty. Working around furniture, people and pets is slower, needs more protection, and needs a working day that fits somebody else's life.
- Product specified. Paint quality varies enormously and so does its coverage and its life. Specify the product in the quote by name, because otherwise you are being compared against somebody using the cheapest available and the customer cannot tell.
- Number of coats, stated. This is the most common place a competing quote is cheaper.
- Weather, on exterior work, including temperature and humidity limits for the product. An exterior schedule in the wrong season is a schedule that will slip.
- Cleanup and disposal. Leftover paint and solvents cannot simply go in the trash, and doing it correctly is time and sometimes cost: How do I legally get rid of leftover paint, solvents and used oil?.
The EPA lead rule is the trade's one real barrier, and it belongs in the price
Painting is one of the least licensed trades at the state level. Most states have no individual painter license and only require a general contractor license above a dollar threshold. The compliance that actually matters is federal.
The EPA Lead-Safe (RRP) Rule at 40 CFR Part 745 applies to paid work disturbing painted surfaces in homes or child-occupied buildings built before 1978, above 6 square feet inside or 20 square feet outside. If it applies, your business must be an EPA-certified firm and the work must be carried out by a trained renovator. Firm certification runs for five years; the individual renovator training is an 8-hour course from an EPA-approved provider with a 4-hour refresher every five years.
For pricing, three things follow:
It is a cost and it belongs in the number. Certification, training, containment materials, and the extra time that lead-safe work practices take on site are all real.
It is a competitive advantage, so say so. Enforcement is real and tightening. A cheaper quote on a pre-1978 house from an uncertified painter is cheaper because they are not doing the work the law requires, and it is entirely fair to tell the customer what your price includes and why. That is the strongest version of the argument in Why you should never be the cheapest bid, and what a cheap price tells the customer.
Never absorb it. If the house is pre-1978 and the work is above the threshold, the price carries it or you do not take the job.
Do I need lead-safe (RRP) certification to work on pre-1978 homes? is the detail, and Lead and asbestos in older buildings is the wider hazard.
Low entry cost means competing on something other than price
Because the barrier to starting is low, the market is crowded with people who will always be cheaper than a properly run business, and some of them will not be trading next year. You do not win that fight by matching them.
What works is everything that is not the number: a specification the customer can read, a named product, a stated number of coats, protection and cleanup they can see, showing up when you said, and a warranty backed by a business that still exists. Construction warranties explained is what you are on the hook for, and reviews are the cheapest proof you will ever build: How to get more reviews the honest way.
Labor burden and the comp class
Employer FICA at 7.65 percent, unemployment tax, general liability and workers comp put labor burden in the usual construction range of 30 to 50 percent on top of the wage. Comp is a rate per $100 of payroll by class code times your experience mod, and interior painting sits low in the construction range while exterior work at height sits considerably higher. Make sure your payroll is classified correctly if you do both, because a misclassification is corrected at the year-end audit and it arrives as one bill. Workers' comp for contractors and Workers' Comp Estimator.
Hazard communication also applies to the products you carry and use, which means safety data sheets and labeling: Hazard communication: SDS, labels, and your right to know.
Where to go next in this section
- How to price your work so you actually make money, the stack underneath.
- Why you should never be the cheapest bid, and what a cheap price tells the customer, which is the central problem of this trade.
- How to explain your price when they say "that's a lot", for the prep conversation.
- How to price drywall work, because the finish level you inherit decides how your paint looks.
- How to become a painter, for the RRP requirements in full.
- How to write an estimate that wins the job and protects you, where the specification goes.
Common questions
How do I compete with cheaper painters?
Not on price, because in a trade with this low a barrier to entry there will always be somebody cheaper and some of them will not be in business next year. Compete on what the customer cannot see in a number. Put the prep in the quote as a specification: what is washed, scraped, sanded, filled, caulked and primed, with what product, and how many coats. Name the paint. State the protection and the cleanup. On a pre-1978 house, say that your price includes lead-safe work practices and EPA firm certification, because a cheaper quote there is very often cheaper for exactly that reason.
What is usually missing from a cheap paint quote?
Prep, coats and protection, in that order. Prep is most of the labor and none of the visible result, so it is the easiest thing to leave out and the hardest for a customer to notice until the finish fails. The number of coats is the next: two quotes for the same rooms are not comparable if one assumes one coat. Then protection and cleanup, then the extra coat needed for a significant color change. On older properties add lead-safe compliance. Listing all of them in your own quote is the only reliable way to make the comparison honest.
Does the EPA lead rule really apply to ordinary repainting?
Yes, whenever the work is paid, the property is a home or child-occupied building built before 1978, and you disturb painted surfaces above 6 square feet inside or 20 square feet outside. Scraping and sanding old paint is exactly that. Your business must be an EPA-certified firm, valid for five years, and the work must be done by a trained renovator who has taken the 8-hour course with a 4-hour refresher every five years. Enforcement is real and tightening. Price the certification, the containment and the extra time in, and never take a job where you would have to absorb it.
How do I price a repaint when the existing paint is failing?
Exclude it and price the repair separately, because failing coatings turn a repaint into a strip-and-prepare job with several times the labor. Write in the quote that the price assumes existing coatings are sound and adherent and existing substrate is in good repair, and that stripping, substrate repair, rot, failed glazing or water damage are priced separately. Then look properly before quoting rather than after. Peeling, chalking and incompatible previous products are the three things that most reliably turn a profitable exterior repaint into a loss.
Should I specify the paint product in my quote?
Yes, by name and by line. Paint quality varies enormously and so does coverage, durability and how it looks in two years, and a customer cannot tell the difference between your quote and a cheaper one using the least expensive product available. Naming the product makes the comparison real and makes your price defensible, and it also protects you when a customer later blames the finish rather than the material they chose. State the number of coats in the same place, because that is the other invisible variable that makes two quotes look comparable when they are not.
The honest bit
- There are no dollar rates here, per square foot, per room or per hour. Painting rates vary widely by market and by the condition of what you are painting.
- The RRP thresholds, the 1978 date, the five-year firm certification, the 8-hour renovator course and the 4-hour refresher are federal figures as recorded in this site's own painting guide. Verify at epa.gov before relying on them.
- Whether your state requires any license for painting, and above what project value, is a state question.
- Paint and solvent disposal rules are set federally and by your state and locality. Confirm what applies where you work.
- Workers comp class codes and rates are set per state and per carrier. The point here is that interior and exterior sit in different classes.
- This is general guidance, not legal, tax or financial advice.
Know someone who needs this?
Keep reading
Templates you might need
Was this guide useful?
Didn't find what you were looking for?
Spotted something wrong or out of date? Email us at hello@kilnguides.co.uk.
In crisis? 988 Suicide & Crisis Lifeline 988 ·